RAPID INSTALLATION,
MAXIMUM FLOW RATES
A. UV resistant PE100 HDPE primary pipe
B. UV resistant PE100 HDPE secondary pipe
C. Tie layer (bonding layer)
D. EVOH barrier layer
B
For demanding applications like data centers, oilfields, mining, and
fuel storage terminals, the UPP® Large Bore Pipework System delivers
unmatched performance in 3" and 4" high-flow and petroleum fuel
transfer solutions.
SOLUTIONS:
A
C
D
UPP® LARGE BORE PIPEWORK
With over 45 years of proven reliability, this advanced electrofusion pipework system
ensures seamless, leak-proof, and corrosion-free operation, setting the global standard
for large-diameter fuel transfer solutions.
HDPE construction for superior durability, flexibility, & UV resistance
Electrofusion welding process bonds components into a seamless system
At just 25% the weight of steel, UPP® pipe is lighter & easier to handle
Rapid installation process accelerates commissioning timelines
Double wall design built to withstand above & below ground applications
Maintenance-free design delivers reliable, worry-free performance
ELECTROFUSION WELDING
During the electrofusion welding process, an electric current is applied
through coils molded in the UPP® coupler pipe fittings. This heat melts the
HDPE material, fusing the pipe and fitting into a seamless, leak-proof joint.