APT® XP PIPE: C U T B A C K
Once the pipe run is pulled and each section is cut to length, square off the end of the
pipe, de-burr it, and then proceed with the cut-back. If you are using SC (Secondary
Contained) piping, cut back the scuff guard layer even with or outside of the sump wall
and cut back the SC layer 4½" (11.5 cm).
4.5" (11.5 cm)
Primary Jacket
(Free of clear mylar layer)
* Even with, or outside
of, the sump wall
Secondary Containment Jacket
Scuff Guard
(Including metalized mylar layer)
NOTES: